Detached Dwelling in Mill Hill

A recently completed project for Acre Contractors.

A new build detached dwelling which required 36no. 300mm diameter CFA piles completed with our Soilmec SR30S, and two levels of 600mm x 600mm reinforced concrete Ground Beams on cellcore.

The building inspector commented that “it was the tidiest job he had seen in a long time”.