Piles may form part of the permanent structure or be used solely for the temporary excavation stage. They can be designed as either free cantilever or propped.
Contiguous Bored
This method of piling creates a retaining wall to restrain the strata while excavations are carried out to form basements or to maximise the usable space on a site.