Due to complications with existing drainage, 4 No. Auger bored piles were the answer to enable this rear extension to be built.
Even with our small T15000 rig, access was incredibly tight so a crane was required to get the rig in and out.
All in a days work.
Spec sheets for all our rigs including the T15000 can be found here.