arrow-rt close icon instagram-icon

If required, in water bearing or granular strata, piles can be interlinked in ‘secant’ construction to prevent the water entering into the excavation or prevent the granular material becoming dislodged during the excavation stage.

Need help & advice on a piling project?

Get in touch