Luxury Residence in Weybridge

Construction of a large 2 storey detached house for Redridge Building Contractors, including the supply and installation of piles and ground beams.

First we installed 56 No. 300mm diameter CFA bored piles using our Soilmec SR20 rig.

We then returned to site and installed 600 x 450mm reinforced concrete ground beams with cellcore.

Quality finish!

You can find out more about the Soilmec SR20 and all our other rigs in our Technical Resources section.

Blog Gallery

Ground beams construction.
Cherry picker truck in a construction site.
A massive truck is being lifted onto a trailer.
A truck parked on the side of the road.
A construction crane is parked on the side of a road, ready for its next job.
A truck is parked in front of a gate.
A machine is drilling a hole in the ground.
Cement mixer and crane at construction site.
Ground beams construction.
Ground beams construction.
Ground beams construction.
No items found.
Share this post

Continue reading

August 24, 2023
New Monks Park Lancing
Site of three piling machines on a field and blue sky.
New Monks Park Lancing
July 6, 2023
Sussex Heritage Trust Awards 2023
People passing by a villa.
Sussex Heritage Trust Awards 2023
August 4, 2022
Piles and Ground Beams in Surrey
Construction site with multiple cars
Piles and Ground Beams in Surrey
November 26, 2021
Piled Slab in Kent
Construction site.
Piled Slab in Kent